| PEI Composter Facility - Brookdale, PEI |
|
|
|
||||||||||||||
| PEI Composter Facility | |
|---|---|
| Project Description: |
Building 1 was designed with a Convex and Double Panel System. The panel used was 4 ½ corrugated and coated with a 8/8 Barrier Coat Finish. Building 2 is our Convex System. A 7 ½ corrugated panel coated with 8/8 Barrier Coat Finish. Both buildings made use of a stainless steel footing channel. |
| Size of Project: | Building 1: 203’-4” x 274’-3” x 10’ to 17’ Building 2: 85’ x 162’ x 21’ on a 10’ stemwall |
| Project Completion: |
Spring 2002 |
| Special Features: | Barrier Coat Finish for Corrosive environments. |
| BEHLEN Dealer: | Southwest Steel Products |
| Erector: | Fernie Lalonde |